Home, public AC and fast DC side by side. Enter three prices and compare the same session and energy costs per 100 km. No need to change the rate for each calculation.
Not all fees have been confirmed. The bill may be higher.
Energy from the grid
40.00 kWh
Into the battery
36.00 kWh
Energy only
48.00 PLN
Fees entered
0.00 PLN
Energy per 100 km24.00 PLN
20.00 kWh from the grid per 100 km. Excludes session fees and subscriptions.
Public AC
Partial session cost80.00 PLN
Not all fees have been confirmed. The bill may be higher.
Energy from the grid
40.00 kWh
Into the battery
36.00 kWh
Energy only
80.00 PLN
Fees entered
0.00 PLN
Energy per 100 km40.00 PLN
20.00 kWh from the grid per 100 km. Excludes session fees and subscriptions.
Fast DC
Partial session cost100.00 PLN
Not all fees have been confirmed. The bill may be higher.
Energy from the grid
40.00 kWh
Into the battery
36.00 kWh
Energy only
100.00 PLN
Fees entered
0.00 PLN
Energy per 100 km50.00 PLN
20.00 kWh from the grid per 100 km. Excludes session fees and subscriptions.
The comparison assumes the same energy draw for every option. It does not predict differences in actual AC and DC efficiency or charging time. We do not select the cheapest full session from incomplete fee data.
Energy into the battery is the usable capacity multiplied by the increase in charge level. We calculate grid energy by dividing this result by charging efficiency: 1 minus the loss expressed as a fraction.
60 kWh × (80% − 20%) = 36 kWh into the battery 36 kWh ÷ 0.90 = 40 kWh from the grid 40 kWh × 2.50 PLN/kWh = 100 PLN for energy
This example assumes a loss of 10% of energy drawn from the grid. If you enter metered kWh, we do not add losses again. The cost per 100 km includes energy only; additional fees apply only to the specified session.