Hotel Villa Aromat Włoszczowa (P)
Jędrzejowska 81, Włoszczowa
0.2 km from this station
Zobacz stację →CHARGING STATION · Włoszczowa
Jędrzejowska 79c, Włoszczowa
Operator: ZPUE S.A. · Number of points: 3
Jędrzejowska 79c, 29-100 Włoszczowa
Jędrzejowska 79c, Włoszczowa
Source locality: Włoszczowa
Device identifiers: 119508
The station is open according to its reported opening hours. Check entry conditions with the operator.
Status and price apply to a specific charging point.
| Point and connectors | Reported status | Energy price |
|---|---|---|
| Point 1PL-D4X-E9C237A85Type 2 · 22 kW | Reported availableStatus changed: 02/11/2026, 11:48:37 | 1.75 PLN/kWhPrice changed: 20/08/2026, 14:17:50 |
| Point 2PL-D4X-E3BE48CFCCHAdeMO · 50 kW | Reported availableStatus changed: 29/10/2026, 20:18:01 | 2.10 PLN/kWhPrice changed: 16/12/2024, 13:42:35 |
| Point 3PL-D4X-E6F8CEEE0CCS2 · 120 kW | Reported availableStatus changed: 01/11/2026, 18:18:53 | 2.40 PLN/kWhPrice changed: 20/08/2026, 14:18:50 |
Kawa, posiłek lub nocleg w promieniu 1 km. Wybierz kategorię, a następnie pobierz miejsca z Google. Wyniki mogą obejmować do 20 noclegów lub 5 lokali.
Confirm pet acceptance, room availability and pet fees before booking. A nearby hotel does not necessarily have a charger for guests.
Suspension, temporary closure or entry restrictions may prevent access despite the listed hours.
Straight-line distances. Check statuses and prices on each station's page.
Jędrzejowska 81, Włoszczowa
0.2 km from this station
Zobacz stację →Różana 11 11, Koniecpol
22.4 km from this station
Zobacz stację →Loading Stacja Obok reviews…
Additional source: Mangrove Reviews. A selection of up to 12 recent records. These reviews concern the named places, not necessarily the charging station. A signature does not verify a visit. Mangrove ↗
Additional reviews load when this section becomes visible.
Records marked as generated are excluded. Absence of that flag does not guarantee authenticity. Coverage is incomplete; no walking route is implied.
Station data and reported statuses come from EIPA, Poland's Office of Technical Inspection. Reading an export is not a physical test of the device. An available point may be occupied before you arrive.
The listed rates cover energy reported to EIPA. There may be different tariff variants, per-minute, start and parking fees, and subscription terms. A fee missing from the data does not mean it is zero. Confirm the final price with the operator.
How we compare the full cost of a stop →