1.91 PLN/kWh · price changed: 18/09/2023, 10:44 · older tariff record, current validity to be confirmed
2.52 PLN/kWh · price changed: 18/09/2023, 10:44 · older tariff record, current validity to be confirmed
Different tariff options. We do not assume which connector or payment method they apply to.
These are energy rates, not the full cost of a stop. Start, time and parking fees may be charged separately.
Point 2
CCS2
120 kWUnavailablePrice to be confirmed
Point details and tariffs
Code: PL-WUA-EPDOT0168
CCS2 · 120 kW
Status changed: 18/09/2023, 10:42.
2.71 PLN/kWh · price changed: 18/09/2023, 10:44 · older tariff record, current validity to be confirmed
These are energy rates, not the full cost of a stop. Start, time and parking fees may be charged separately.
What will you do while charging?
Coffee, a meal, shopping, a walk or playtime with children within 1 km. Choose a category and load places from Google. Up to 20 accommodation options or 5 places in other categories.
Confirm pet acceptance, room availability and pet fees before booking. A nearby hotel does not necessarily have a charger for guests.
Station reviews
Google rating and reviews
Google ratings, reviews and nearby places are optional. Enable functional content in privacy settings to display them.
Additional source: Mangrove Reviews. A selection of up to 12 recent records. These reviews concern the named places, not necessarily the charging station. A signature does not verify a visit. Mangrove ↗
Additional reviews load when this section becomes visible.
Records marked as generated are excluded. Absence of that flag does not guarantee authenticity. Coverage is incomplete; no walking route is implied.
Station data and reported statuses come from EIPA, Poland's Office of Technical Inspection. Reading an export is not a physical test of the device. An available point may be occupied before you arrive.
The listed rates cover energy reported to EIPA. There may be different tariff variants, per-minute, start and parking fees, and subscription terms. A fee missing from the data does not mean it is zero. Confirm the final price with the operator.